S250-8P · Universal 8-sleeve pile cap
Replace bored piers & screw piles in about 10 minutes per footing
Up to 100kN capacity with 4, 6 or 8 micropiles driven in 2, 3 or 4 directions — built for tight sites with underground services, boundaries, slopes and internal corners.
- No reinforcement cage
- No cast-in hold-down bolts
- Galvanised micropiles
100kN
Load capacity (up to)
~10 min
Install time per cap
8 sleeves
4, 6 or 8 micropiles
2 · 3 · 4-way
Pile drive directions
BUILT FOR DIFFICULT SITES
Multiple sleeve directions let you steer piles around obstacles instead of redesigning the footing.
Underground services
Drive piles parallel to services in a 2 or 3-way orientation to avoid clashes.
Boundaries
Point piles away from the boundary line and keep footings where the plans need them.
Steep terrain
Compact, lightweight caps install in tight spaces, even on sloping blocks.
Internal corners
Choose pile directions that suit the geometry rather than forcing a standard layout.
THE ECONOMICAL ALTERNATIVE
The S250-8P replaces bored piers and screw piles under slab on ground, strip footings and concrete pads.
- Replaces bored piers
- Replaces screw piles
- Replaces concrete pads
- Removes the reinforcement cage and cast-in hold-down bolts
WHERE IT’S USED
Residential, modular buildings, sea containers, tie-downs, mining, commercial, solar, decks, patios, sheds, fences, retaining walls and more.
Residential homes
Eight micropiles keep your home level and stable over time, and fast installation shortens the build so you move in sooner.
Near boundaries & services
Multiple sleeve options let piles run parallel to underground services and clear of boundaries. Identify service locations and depths at design stage.
Light & camera poles
Supports light poles, air and traffic monitoring equipment and camera poles. For taller poles with a higher bending moment, see the S400-12P.
TECHNICAL SPECIFICATIONS
Everything your engineer or builder needs to specify the S250-8P.
| Load capacity | Up to 100kN |
|---|---|
| Micropiles | Up to 8 × 32NB (nominal bore), 42.4mm OD galvanised pipe — light, medium or heavy |
| Pile configuration | 4, 6 or 8 piles; 2, 3 or 4-way direction |
| Bolting pattern | 140mm centres × 4 × 22mm holes 120mm centres × 4 × 18mm holes |
| Installation time | Approx. 10 minutes |
| Applications | Residential, modular buildings, sea containers, tie-downs, mining, commercial, solar, security & light poles, decks, patios, sheds, fences, retaining walls |
HOW QUOTING WORKS
01
Send your plans
Share drawings, footing loads and soil information if you have them.
02
Mark your services
Include the location and depth of underground services so pile directions can be set at quote stage.
03
Get your quote & install
We specify 4, 6 or 8 piles for your loads and soil, then install fast.
GET AN S250-8P QUOTE
Tell us about your project, including loads, soil information and the location of any underground services, and we’ll come back with the right pile configuration and a price.
Prefer to talk? (08) 9434 3161
Swivelpole™ partnership: Giraffe Pole™ G5 and F7 freestanding poles are available to pair with the Surefoot S400-12P pile cap. Learn more about Swivelpole™.